Utrecht Netherlands: 510 student homes

Built in 7 months (completed in July 2017): 510 studenthomes in the city of Utrecht. The modular system chosen for this project: prefabricated modular homes of 3,5 x 13 meter (containing 2 rooms and a corridor in the middle). Extra outside facade with insulated panels. Project will stay for 12 to 15 years maximum. Tempohousing was contracted for the production line set up, quality control and construction site project management. Modules were all manufactured in The Netherlands.